Japan gets peek at new proposed Olympic stadium designs | Inquirer Sports

Japan gets peek at new proposed Olympic stadium designs

/ 02:14 PM December 15, 2015

This artist rendering provided by the Japan Sports Council Monday, Dec. 14, 2015 shows the inside of Design "A" proposed by one of two groups competing to build the new Tokyo Olympic stadium. The Japan Sports Council released the designs on Monday and said the winner will be chosen this month. It did not identify which companies have proposed which designs. The Japan Sports Council/AP

This artist rendering provided by the Japan Sports Council Monday, Dec. 14, 2015 shows the inside of Design “A” proposed by one of two groups competing to build the new Tokyo Olympic stadium. The Japan Sports Council released the designs on Monday and said the winner will be chosen this month. It did not identify which companies have proposed which designs. The Japan Sports Council/AP

TOKYO — Two groups competing for the lucrative contract to build the new stadium for the 2020 Tokyo Olympics have disclosed their design proposals.

The Japan Sports Council released the designs on Monday and said the winner will be chosen this month. It did not identify which companies have proposed which designs.

Article continues after this advertisement

The two designs are more understated than the original plan by British-Iraqi architect Zaha Hadid, which was scrapped due to controversy over its cost and scale.

FEATURED STORIES

“We will work to ensure a stadium that will be loved by all,” Kazumi Daito, president of the Sports Council, said in announcing the plans, which he said would put “athletes first” and also emphasize accessibility for the disabled, elderly and children.

Work on the 158 billion yen ($1.3 billion) stadium intended to accommodate up to 80,000 people was delayed by the difficulties over its design, which proved a major embarrassment for local Olympics organizers.

Article continues after this advertisement

Design “A” has a relatively flat roof and fits in with surrounding greenery, with shrubbery along its outer concourses. The combined steel and wood structure seems to echo traditional temple designs, and stands only 50 meters (164 feet) tall, with a center sports ground sunk below the surface.

Article continues after this advertisement

Its construction cost is listed at a total of 153 billion yen ($1.26 billion).

Article continues after this advertisement

The 54.3-meter-tall (178 feet) Design “B” is more ethereal, with outer glass walls that blend with the sky and are meant to reflect the traditional Asian concepts of the Five Elements of wood, fire, earth, metal and water. It would cost 153.7 billion yen ($1.26 billion).

Both plans call for construction to be done, apart from landscaping and surrounding work, by Nov. 30, 2019.

Article continues after this advertisement

The stadium will replace the razed National Stadium, which was built in the late 1950s and hosted the 1964 Olympics.

Your subscription could not be saved. Please try again.
Your subscription has been successful.

Subscribe to our daily newsletter

By providing an email address. I agree to the Terms of Use and acknowledge that I have read the Privacy Policy.

TAGS: Japan, Olympics, stadium, Tokyo

Your subscription could not be saved. Please try again.
Your subscription has been successful.

Subscribe to our newsletter!

By providing an email address. I agree to the Terms of Use and acknowledge that I have read the Privacy Policy.

© Copyright 1997-2024 INQUIRER.net | All Rights Reserved

This is an information message

We use cookies to enhance your experience. By continuing, you agree to our use of cookies. Learn more here.